MBA Case Study The Risk Management Department

MBA Case Study The Risk Management Department.

Read “The Risk Management Department” case (see attached). As you complete the analysis, address the topics below in your case analysis.

1. Financial risk, strategic risk, operational-technical risk, and operational-safety risk represent project risk sources within an organization. Discuss each from a theoretical aspect.

2. Evaluate which of the sources/risks above with which Cooper Manufacturing is involved. Explain the amount of risk associated with each.

3. Explain scheduling techniques that Cooper Manufacturing might use to mitigate its risks.

4. Explain specific tasks that Cooper Manufacturing should use to manage its project risks. In formatting your case analysis, do not use the question-and-answer format; instead, use an essay format with subheadings.

The APA-formatted case study should be a minimum of two full pages in length (not counting the title and reference pages). Use a minimum of three academic sources that are no more than 5 years old, one muse be the textbook ( Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Hoboken, NJ: Wiley). All sources used, including the textbook, must be referenced; paraphrased material must have accompanying in-text citations. A minimum of three in-text citations are required.

MBA Case Study The Risk Management Department

"Looking for a Similar Assignment? Order now and Get a Discount!